This Project comprised assisting the Shire with funding submissions, obtaining the necessary regulatory approvals, completing a catchment flow analysis, structure sizing, detailed road design, assurance of the structural design for the reinforced concrete structure, preparation of cost estimates, management of the tender process including preparation of the tender documents and tender evaluation and supervision of the bridge construction.