May 2, 2023
The scope of work comprised the design of various segments of the Carnarvon Mullewa Rd from the existing unsealed standard to a sealed standard. Greenfield prepared the engineering design in accordance with relevant industry standards […]
May 3, 2023
Intersection design on the MRWA network will typically involve existing local public roads, existing private access roads or new private access roads and require formal design approval from MRWA. All design works are in accordance […]
May 3, 2023
The Rabbit Proof Fence Rd intersection upgrade project comprises the design of the intersection and associated adjacent floodway on the southern side of the intersection. The upgrade focused on improving the geometry of existing intersection […]
May 3, 2023
Greenfield has been actively involved in the upgrade of Warriedar Copper Mine Rd to a sealed standard since 2020. Greenfield recently completed the design detailing and reporting of the section of Warriedar Copper Mine Rd […]
May 3, 2023
The scope of work comprised of engineering design of a new sealed formal carpark adjacent an aerodrome hanger at the Onslow airport. The design involved maximising the number of vehicle bays available for light vehicles […]
May 3, 2023
The scope of work comprised the engineering design of an upgrade of the Shire Office Carpark, Wiluna Caravan Park parking area, Wiluna Swimming Pool carpark, and Gunbarrel Discovery Centre carpark and access road from the […]
July 25, 2017
The Kalbarri National Park Access Road Upgrade Project comprises the design and construction of 22km of sealed access road and 3 car parks within the Kalbarri National Park. Greenfield completed the detailed design in 2016 […]
July 9, 2017
Project comprised the design and construction of a 5-leg round about on Point Leander Drive, Dongara. Greenfield developed the innovative design and fulfilled the role of Construction Superintendent.
July 10, 2017
In 2012, Greenfield provided engineering and construction supervision services to the Shire of Mingenew for the Depot Hill Bridge upgrade Project. This Project comprised assisting the Shire with funding submissions, obtaining the necessary regulatory approvals, […]
January 31, 2017
Project comprised the upgrade of 17km of narrow seal and unsealed local public roads to a sealed standard for road train haulage to support mining operations. Greenfield completed the road and drainage design for the […]
May 3, 2023
Routine level 1 bridge inspections are undertaken every year since 2018 for a wide range of local governments in various regions including but not limited to:
May 3, 2023
Greenfield is routinely involved in the desktop assessments. This includes, Assessment of current configurations, standard and condition of Road length in the context of current and future traffic volumes and configurations to an extent possible […]
May 7, 2014
Greenfield completed the design, tender management, contract administration and construction supervision to the Shire of Sandstone for the upgrade of numerous unsealed floodways on the Sandstone – Paynes Find road. The Project was completed successfully […]